Post Tagged with: "brownfields"

Hannah Solar mounts arrays on Tiernan & Patrylo buildings through brownfield program

Hannah Solar mounts arrays on Tiernan & Patrylo buildings through brownfield program

March 15, 2017 at 8:00 am Comments are Disabled

Brownfields are a big opportunity for the solar industry. Tiernan & Patrylo recently partnered with Hannah Solar on two roof-mount solar arrays atop their buildings in Peachtree City, Ga. The combined 755 kilowatt (kW) systems are just the latest addition to the properties, which the company recently revitalized under theRead More

Borrego Solar installation at 311 Emery Street in Palmer, MA. (Photo By: Greg M. Cooper / Borrego Solar)

Brownfield in Massachusetts receives 6-MW system, developed by Syncarpha Capital

February 8, 2016 at 10:47 am Comments are Disabled

  Syncarpha Capital LLC, Borrego Solar Systems Inc., and Renewable Energy Massachusetts LLC (REM) completed a 6-MW solar array located on the former Palmer Metropolitan Airfield in Palmer, Mass. The Palmer Airfield project is unique in that it is both the first and, at 6 MW, the largest Department of EnergyRead More

A 3-MW New Jersey landfill Project from Solar FlexRack.

Mounting Challenges: Landfills, Brownfields, Water-Saturated Sites

August 3, 2015 at 12:30 pm 2 comments

Landfills Two of the most common types of landfill construction and classification are sanitary (municipal waste) and construction, demolition and debris (CDD) landfills. Sanitary landfills are normally constructed under rigid environmental specifications and standards, including rubber membrane linings for leachate collection, ground water monitoring wells, methane gas monitoring wells andRead More

Click to watch video

GameChange Pour-in-Place system used in 2.5 MW Mass. landfill install

June 4, 2015 at 10:36 am 1 comment

Citizens Energy Chairman Joseph P. Kennedy II, a former Member of Congress, joined with Westfield, Mass., Mayor Daniel Knapik in the ceremonial flipping of a switch in western MA featured in WWLP 22 NEWS. The 2.5 MW Solar Landfill Installation utilized the GameChange Racking Pour-in-Place Ballasted Ground System, and isRead More