APA Racking explains the value of turnkey providers for solar project managers

APA Ground screw

The following post is from APA Racking’s Solar Solutions blog series.

As timelines get delayed and projects overlap each other, project managers can quickly get overloaded by juggling multiple projects at once. Hiring more skilled project managers isn’t as easy as it seems with this skill set in high demand and a severe shortage of qualified individuals. Even with the best project control systems in place and utilizing dashboards, key performance indicators, and critical callout’s, the sheer time it takes to manage such systems can be daunting.

APA has seen more and more companies move toward a turnkey solution. By bringing the manufacturing and installation process under one roof, project managers can breathe a little easier. The turnkey delivery consolidates multiple contracts into a single point of accountability. The result should be certainty of schedule and cost, reduced contract execution time, minimizing change orders, faster decisions, and the ability to communicate with one individual for all things project related. About 80% of APA’s projects are turnkey, and even with material only sales, a project manager is assigned to every project to ensure a smooth process.

RELATED: When augers, ground screws make economic sense for solar contractors

APA is first and foremost a racking manufacturer, but has evolved into a full mechanical turnkey installation partner with many customers. APA works with the customer in the actual design of the project and can mitigate any construction related problems before breaking ground. Changes on paper are certainly easier and more cost-effective than after the installation has begun.

APA’s years as an installation partner provides insight that designers may not have. Issues such as working around underground utilities, topography adjustments, and variations in soil types can be addressed swiftly and creatively. Many times, APA can recommend using multiple foundations on a site to accommodate various soil types and manage costs.

For example, a proposal may include a helical foundation for 60% of the site and a ground screw for the remaining 40% due to areas with rock. The cost savings can be significant versus a 100% ground screw solution.

For the project manager, a mechanical turnkey solution means managing less subcontracts and more time for critical decisions at the highest level without being inundated with minute details. Real time project updates are sent daily and represent the entire project scope with design, manufacturing and installation.

Have you checked out our YouTube page?

We have a ton video interviews and additional content on our YouTube page. Recently we debuted Power Forward! -- a collaboration with BayWa r.e. to discuss higher level industry topics as well as best practices / trends for running a solar business today.

Our longer running side project is The Pitch -- in which we have awkward discussions with solar manufacturers and suppliers about their new technology and ideas so that you don't have to. We've discusses everything from residential rail-less deck attaching and home solar financing to large-scale energy storage value stacking and utility-driven new home solar + storage microgrids.

We also post our Project of the Year announcements there! Interviews with this year's winners will be up starting the week of Nov. 8. Head there and subscribe today to stay on top of all this extra stuff.

Tags:

Comments are closed here.